Dover AFB
2021
Work included design, demolition, installing new ADA accessible cabinets & countertops, installing new appliances (ADA accessible dishwasher, ADA stainless steel sink with sprayer faucet, garbage disposal, microwave), new electric outlets, new subpanel and breakers, new wiring/conduit, new drain, new hot & cold waterlines, new vent, replace/new mosaic tile flooring in Men’s Room, QC, safety, as-built drawings, etc.